• Email
  • Print

Poinsettia Lane Gap Closure

The completion of Poinsettia Lane from Cassia Road to El Camino Real has long been a part of the city’s Master Plan. As Lennar Homes has been constructing its Poinsettia 61 development, it has also built this missing piece of Poinsettia Lane which is nearing completion. To prepare for the gap closure project, the City of Carlsbad commissioned a traffic study and hosted neighborhood workshops.

As recommended in the traffic study, two new signals are planned at the intersections of Cassia Road at Poinsettia Lane and Oriole/Skimmer Courts at Poinsettia Lane. 

Quick Links

Contact

For more information, please contact city traffic engineer, John Kim.
760-602-2757
john.kim@carlsbadca.gov